सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

Teesta erosion threatens NH10, officials consider post-monsoon tunnel

GS2Polity · Governance · IR· India & neighbourhood· Prelims·

Why in news

The Teesta River's erosion and landslides have severely damaged NH10, leading to plans for a tunnel to ensure the stability of Sikkim's critical supply chain.

Background

NH10 connects Sikkim with West Bengal. A landslide on July 7 caused a 250-metre blockage. Officials are evaluating a post-monsoon tunnel to counter Teesta River erosion.

Facts for Prelims

  • PlaceNH10: A vital highway connecting Sikkim to West Bengal.
  • FactThe July 7 landslide measured approximately 250 metres in length.
  • S&TTunneling is being considered as a long-term engineering solution to river erosion and landslide-prone terrain.

For Mains

Q. Discuss the challenges of infrastructure development in the Himalayan region and the importance of resilient connectivity for the socio-economic stability of border states.

Dimensions to cover in your answer

  • geological hazards
  • supply chain resilience
  • climate change impact on infrastructure

Keywords: geological instability · supply chain · resilient infrastructure · connectivity

Read the full news →Report a mistake in this noteSource: NDTV ↗Also: GS1 · Places in news / mappingAlso: GS3 · Infrastructure (energy, ports, roads, railways)

More International Relations notes

All International Relations current affairs →

Something wrong, or something missing?

Spotted a mistake in a note, or want a topic, format or PDF that would help your preparation? Write to us. We read every mail and fix errors fast.

Report a mistake →Ask for something →[email protected]

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.