सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

Arunachal Pradesh State Cabinet approves panel for survey of Siang mega dam

GS3Economy · S&T · Environment · Security· Nuclear & new energy technology· Prelims + Mains·

Hydroelectric power vs ecological preservation: a GS3 case study on infrastructure and environmental trade-offs.

Why in news

The Arunachal Pradesh State Cabinet approved an Empowered High-Level Committee to conduct a pre-feasibility survey for the Siang Upper Multipurpose Project (SUMP) despite local protests.

Background

The Siang Upper Multipurpose Project (SUMP) aims to generate 11,000 MW of power and provide flood mitigation in the Siang-Brahmaputra basin. The project is intended to boost employment and socio-economic development in the region.

Facts for Prelims

  • FactSUMP target capacity: 11,000 MW
  • PlaceSiang-Brahmaputra basin: Location of the proposed project
  • PostPema Khandu: Chief Minister of Arunachal Pradesh

Prelims practice question

With reference to the Siang Upper Multipurpose Project (SUMP), consider the following statements:

  1. The project aims to generate a target capacity of 11,000 MW.
  2. The project is intended to provide flood mitigation and boost socio-economic development.
  3. The project is located in the Siang-Brahmaputra basin.

Which of the statements given above is/are correct?

  1. (a)1 only
  2. (b)1 and 2 only
  3. (c)1 and 3 only
  4. (d)1, 2 and 3
Show answer

Answer: (d) 1, 2 and 3 — Statements 1, 2 and 3 are correct.

For Mains

Q. Discuss the trade-offs between large-scale hydroelectric projects and ecological preservation in ecologically sensitive zones like the Brahmaputra basin.

Dimensions to cover in your answer

  • Ecological risk: Potential impact on biodiversity and siltation patterns in the Brahmaputra river system
  • Socio-economic friction: Balancing state-led infrastructure goals with local community rights and environmental concerns

Keywords: Pre-feasibility report · Hydroelectric power · Flood mitigation · Socio-economic development · Ecologically sensitive zones

Read the full news →Report a mistake in this noteSource: The Hindu ↗

More Science & Technology notes

All Science & Technology current affairs →

Something wrong, or something missing?

Spotted a mistake in a note, or want a topic, format or PDF that would help your preparation? Write to us. We read every mail and fix errors fast.

Report a mistake →Ask for something →thesatyadheesh@gmail.com

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.