सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

Strategic, all-weather Zojila Tunnel between Kashmir and Kargil to see final breakthrough

GS3Economy · S&T · Environment · Security· Border management· Prelims + Mains·

Why in news

Union Minister Nitin Gadkari is set to oversee the final blasting of the Zojila Tunnel on June 9th to provide all-weather connectivity between Kashmir and Kargil.

Background

The Zojila Tunnel is a 13.14 km long tunnel located at an altitude of 11,578 feet. It connects the Kashmir valley with Kargil and is designed to facilitate the transport of goods and supplies to high-altitude bases during winter months.

Facts for Prelims

  • PlaceZojila Tunnel connects the Kashmir valley with Kargil
  • FactThe Zojila Tunnel has a total length of 13.14 km
  • FactThe tunnel is situated at an altitude of 11,578 feet
  • FactThe tunnel provides all-weather access to high-altitude bases during winter months

For Mains

Q. Discuss how strategic infrastructure projects like the Zojila Tunnel enhance India's internal security and logistical capabilities in high-altitude border regions.

Dimensions to cover in your answer

  • Logistical resilience: Ensuring uninterrupted supply chains to high-altitude bases during extreme winter months
  • Strategic mobility: Enhancing rapid troop movement and security response times between Kashmir and Kargil

Keywords: all-weather connectivity · strategic infrastructure · logistical resilience · border management · high-altitude logistics

Full chronology for revision →Read the full news →Report a mistake in this noteSource: The Hindu ↗Also: GS1 · Places in news / mappingAlso: GS3 · Infrastructure (energy, ports, roads, railways)

More Internal Security notes

All Internal Security current affairs →

Something wrong, or something missing?

Spotted a mistake in a note, or want a topic, format or PDF that would help your preparation? Write to us. We read every mail and fix errors fast.

Report a mistake →Ask for something →[email protected]

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.