सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

NBWL rejects ₹10,000 crore Sharavathi project over habitat harm, sustainability doubts

GS3Economy · S&T · Environment · Security· Species, protected areas & wetlands· Prelims + Mains·

Why in news

The National Board for Wildlife (NBWL) expert committee rejected the ₹10,000 crore Sharavathi Pumped Storage Project in Karnataka due to ecological risks.

Background

The project is a ₹10,000 crore pumped storage initiative located in Karnataka. The NBWL expert committee recommended rejection based on habitat fragmentation, wildlife disturbance, and lack of technical/environmental sustainability.

Facts for Prelims

  • BodyNBWL: National Board for Wildlife is a statutory body under the Ministry of Environment, Forest and Climate Change.
  • FactProject Cost: The Sharavathi Pumped Storage Project is valued at ₹10,000 crore.
  • PlaceLocation: The project is situated in the state of Karnataka.

For Mains

Q. Analyze the conflict between large-scale renewable energy infrastructure and biodiversity conservation in India's ecologically sensitive zones.

Dimensions to cover in your answer

  • Ecological fragmentation: Loss of contiguous corridors for flagship species in Western Ghats biodiversity hotspots
  • Regulatory bottleneck: Balancing the Ministry of Power's infrastructure targets with the Ministry of Environment's conservation mandates
  • Technical trade-off: High-capacity pumped storage requirements vs. irreversible degradation of local riverine ecosystems

Keywords: Habitat fragmentation · Ecological degradation · Pumped storage · Biodiversity conservation · Statutory oversight

Read the full news →Report a mistake in this noteSource: The Hindu ↗Also: GS3 · Infrastructure (energy, ports, roads, railways)

More Environment & Ecology notes

All Environment & Ecology current affairs →

Something wrong, or something missing?

Spotted a mistake in a note, or want a topic, format or PDF that would help your preparation? Write to us. We read every mail and fix errors fast.

Report a mistake →Ask for something →[email protected]

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.