सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

NaBFID plans to raise $1.5 billion via overseas bonds

GS3Economy · S&T · Environment · Security· Monetary policy, RBI & banking· Prelims·

Infrastructure financing and external borrowing mechanisms: a relevant GS3 topic.

Why in news

NaBFID plans to raise $1.5 billion through a combination of a 10-year overseas bond and a $1 billion MIGA-backed 15-year bond to secure long-term infrastructure funding.

Background

NaBFID aims to secure $4 billion in dollar funding by December 2026. The institution utilizes the RBI's concessional US dollar-rupee swap facility, which offers a 1.5% annual swap cost for eligible overseas borrowings.

Facts for Prelims

  • FactRBI's concessional US dollar-rupee swap facility provides a 1.5% annual swap cost
  • FactNaBFID target: $4 billion in dollar funding by December 2026
  • BodyMIGA: Multilateral Investment Guarantee Agency (backing the 15-year bond)
  • FactThe swap facility allows drawdowns until December 31

Prelims practice question

With reference to NaBFID and its funding plans, consider the following statements:

  1. The RBI's concessional US dollar-rupee swap facility offers a 5% annual swap cost.
  2. NaBFID aims to secure $4 billion in dollar funding by December 2026.
  3. NaBFID plans to raise $1.5 billion through a combination of overseas bonds.

Which of the statements given above is/are correct?

  1. (a)1 only
  2. (b)2 only
  3. (c)3 only
  4. (d)2 and 3 only
Show answer

Answer: (d) 2 and 3 only — Statements 2 and 3 are correct. Statement 1 is incorrect: The note states the swap cost is 1.5%.

For Mains

Q. Analyze the challenges faced by Indian infrastructure lenders in accessing low-cost overseas funding amidst fluctuating global interest rates and currency volatility.

Dimensions to cover in your answer

  • Interest rate parity: Narrowing cost advantage between overseas borrowing and domestic rates due to rising US Treasury yields
  • Hedging mechanisms: Role of RBI's swap facility in mitigating currency risk for infrastructure projects
  • Long-gestation financing: Necessity of long-tenor bonds (15 years) for infrastructure project viability

Keywords: External Commercial Borrowings · Hedging Costs · Infrastructure Financing · Interest Rate Parity · Swap Facility

Read the full news →Report a mistake in this noteSource: Economic Times ↗

More Economy notes

All Economy current affairs →

Something wrong, or something missing?

Spotted a mistake in a note, or want a topic, format or PDF that would help your preparation? Write to us. We read every mail and fix errors fast.

Report a mistake →Ask for something →[email protected]

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.